AI Project Discovery & Margin Calculator

See what a discovery overrun does to one project's contribution margin, and to a year of comparable projects.

Enter one fixed-fee project as it was priced and as it ran. The calculator shows the margin movement, keeps internal cost, recovered fees and released capacity apart, and builds a PDF you can take into a delivery review.

  • Free, with no sign-in, no account and no email.
  • Every result shows its formula. Nothing here is a benchmark or a saving.
  • It starts with an illustrative project. Replace the figures with your own.

Your figures stay in your browser; no account or email required.

Your project

What the client pays for the project as originally agreed.

Total internal cost as planned, including planned discovery.

The discovery hours allowed for in that cost.

The hours discovery actually took.

Salary, on-costs and overhead per hour. A blended rate if roles differ.

Change fees or separately paid discovery actually contracted for this project. Blank counts as none.

Projects you would expect to run the same way. Used only for the portfolio scenario.

Rework and avoidable effort (optional)

Anything left blank is left out of the result, never guessed.

Design, build or testing hours caused by missing or wrong discovery. Leave out hours already counted as discovery.

Your assumption of how much of the extra effort was avoidable repetition rather than essential discovery or genuine change.

Only if freed hours would genuinely be resold or redeployed, for example on billable work. Needs an avoidable share.

Your result

Synthetic example

Synthetic example. These starting values are illustrative: the same fixed-fee project as the unpaid-discovery article. Not client data or an industry benchmark.

Contribution margin

30.0% to 20.6%

down 9.4 percentage points

Contribution margin, as priced and as delivered
As priced30.0%
As delivered20.6%
As priced and as delivered
As priced and as deliveredAs pricedAs delivered
Fee£40,000£40,000
Delivery cost£28,000£31,750
Contribution£12,000£8,250
Contribution margin30.0%20.6%

How it is calculated

  1. Contribution as priced: £40,000 − £28,000 = £12,000, a 30.0% margin
  2. Extra discovery: (80 − 30 hours) × £75 = £3,750
  3. Net overrun impact: £3,750 extra discovery − £0 recovered fees = £3,750
  4. Revised fee: £40,000 + £0 recovered = £40,000
  5. Revised delivery cost: £28,000 + £3,750 extra discovery + £0 rework = £31,750
  6. Revised contribution: £40,000 − £31,750 = £8,250
  7. Revised margin: £8,250 ÷ £40,000 = 20.625%, shown as 20.6%

What each figure is, and is not

  • Additional internal cost: £3,750 a project. Team time absorbed by the project; it shows up as lost contribution, not new spending.
  • Contribution change: −£3,750 a project, after any recovered fees.
  • Margin movement: down 9.4 percentage points. A change in percentage points, not a percentage of the old margin.
  • Recovered fees: none entered, so treated as £0.
  • Capacity absorbed: 50 hours a project. Time your team could have spent elsewhere; it becomes money only if it is actually redeployed or resold.
  • Cash savings: none calculated. This tool measures delivery economics, not cash.

Across a year of comparable projects

20 projects × £3,750 = £75,000 of additional internal cost exposure, or 1,000 hours.

A scenario that assumes every project repeats this one. It is not a realised loss, not a benchmark and not recoverable cash.

Reading the result

  • Not every discovery hour is avoidable. Essential discovery, the facts needed for a sound implementation decision, protects delivery; cutting it can increase risk.
  • Avoidable repetition, asking for the same information or revisiting unresolved decisions, needs structure rather than more workshops.
  • Genuine changes, new requirements or constraints, may need a commercial scope decision rather than absorbed effort.

Three practical next steps

  1. Separate approved, client-paid changes from absorbed effort and genuine scope change on this project.
  2. Review five to ten completed projects and compare planned with actual discovery hours before changing how the team works.
  3. Add downstream rework. Discovery can look on budget while missing information reappears as design clarification, defects and rework.
A4, built on your device. Nothing is uploaded.

That's the kind of problem AI-PEX is designed to help implementation firms diagnose, quantify and address consistently.

Explore AI-PEX

The thinking behind the calculator, with a worked example: Read the article on unpaid discovery

The boundary

A diagnostic aid for one project at a time. It does no research, reads no documents and stores nothing. Every figure is internal delivery economics calculated from what you type: not verified, not a benchmark and not a saving.